Thank you to everyone who came out and helped today. We made a lot of progress. The top barn has half of the roof installed and half of the plywood up. The stalls adjacent to the arena are just about complete. The floor is ready for shavings and all the latches have been installed. The shed behind those stalls has also been cleaned out. The back side of the arena and roll up doors were power washed and look great. The new outdoor arena has been cleaned of all sticks and rocks. The entrance has also has been modified. It has been widened and also has gravel. The living area has been painted and we hope to install flooring in the next few days.   Here are just a few pictures from today’s progress.  http://www.riverrunal.com/newbarn/

If you were unable to join in the fun today, our work day continues tomorrow morning at 8:00am.  Come when you can!!  All are welcome!!!